Module 04

Capital Planning

Observe → Document → Prioritize → Budget → Plan. Survey observations become capital items with cost, target year, responsible party, and supporting documentation.

Capital Items

22

Promoted from survey observations

Planned Investment

$5.8M

Current filter

Immediate Exposure

$392K

Action required now

Budgeted or Scheduled

5

Committed in a capital cycle

Filter

Portfolio Capital Forecast

Planned investment by timeline category

Capital Items

Each item traces back to a documented survey observation

PropertyCondition / IssueSource SurveyPriorityRecommended ActionTarget YearResponsibleStatusSupportEstimate
Northgate Town Center

Roof — Building A — Sections 3 & 4

Meridian Roof Sciences concurs with the recommended scope.

Capital Investment Survey High PriorityFull roof replacement of Sections 3 & 4 including tapered insulation.2027LandlordBudgeted 6 1$785,000
Northgate Town Center

Parking Lots — North field — rows 1-8

Capital Investment Survey Planned CapitalMill and overlay with localized full-depth patching, restripe.2028LandlordOpen 8 2$410,000
Northgate Town Center

Site Lighting — Entire site

Meridian Roof Sciences concurs with the recommended scope.

Capital Investment Survey Planned CapitalLED retrofit of 64 pole fixtures with photometric verification.2027LandlordScheduled 4 3$168,000
Northgate Town Center

Exterior Façade — Building C — east elevation

Capital Investment Survey MonitorRepair EIFS panels and full sealant replacement.2029LandlordOpen 3 1$96,000
Northgate Town Center

HVAC — Common area RTUs 1-4

Meridian Roof Sciences concurs with the recommended scope.

Capital Investment Survey High PriorityPhase replacement of four common area RTUs.2027LandlordBudgeted 2 2$240,000
Northgate Town Center

Accessibility — Center court ramp

Capital Investment Survey ImmediateReconstruct ramp and landings to compliant slope.2026LandlordOpen 5 3$62,000
Harbor Point Crossing

Site Drainage — Southwest detention inlet

Crosby Civil concurs with the recommended scope.

Property Condition Survey ImmediateEmergency inlet reconstruction and pavement repair.2026LandlordOpen 7 1$145,000
Harbor Point Crossing

Roof — Anchor building

Property Condition Survey High PriorityReplace anchor roof; coordinate with tenant equipment.2027LandlordBudgeted 9 2$640,000
Harbor Point Crossing

Storefronts — Shop building — suites C-200 to C-260

Crosby Civil concurs with the recommended scope.

Property Condition Survey Planned CapitalRefinish frames and replace hardware.2028SharedOpen 3 3$88,000
Harbor Point Crossing

Trash Enclosures — Rear service court

Property Condition Survey Planned CapitalRebuild two enclosures with bollard protection.2027LandlordOpen 4 1$54,000
Westline Commons

Parking Lots — Main field

Northline MEP concurs with the recommended scope.

Portfolio Condition Survey RoutineSealcoat and restripe on a three-year cycle.2029LandlordOpen 2 2$135,000
Westline Commons

Signage — Primary monument at Westline Ave

Portfolio Condition Survey Planned CapitalRefurbish cabinet and replace faces with LED illumination.2028LandlordOpen 3 3$78,000
Westline Commons

Fire/Life Safety — Fire pump room

Northline MEP concurs with the recommended scope.

Portfolio Condition Survey High PriorityReplace controller and perform full flow test.2027LandlordScheduled 2 1$92,000
Westline Commons

Common Areas — Pedestrian plaza

Portfolio Condition Survey MonitorPlaza refresh with new furnishings and shade sails.2031LandlordDeferred 4 2$210,000
Cedar Mill Marketplace

Exterior Façade — Entire center

Duarte Studio concurs with the recommended scope.

Due Diligence Survey High PriorityComprehensive façade renovation and repaint.2027LandlordOpen 12 3$1,250,000
Cedar Mill Marketplace

Structural — Rear canopy — units 8-14

Due Diligence Survey ImmediateStructural engineer evaluation and canopy column replacement.2026LandlordOpen 6 1$185,000
Cedar Mill Marketplace

Sidewalks — Storefront walk

Duarte Studio concurs with the recommended scope.

Due Diligence Survey High PriorityReplace approximately 3,400 SF of sidewalk.2027LandlordOpen 5 2$74,000
Cedar Mill Marketplace

Electrical — Main switchgear

Due Diligence Survey Planned CapitalSwitchgear replacement and arc-flash study.2028LandlordOpen 2 3$320,000
Cedar Mill Marketplace

Landscaping — Perimeter islands

Duarte Studio concurs with the recommended scope.

Due Diligence Survey RoutineIrrigation repairs and landscape replanting.2027LandlordOpen 3 1$46,000
Northgate Town Center

Loading Areas — Service drive — Building B

Capital Investment Survey Planned CapitalReplace dock aprons.2030LandlordOpen 2 2$68,000
Harbor Point Crossing

HVAC — Shop building RTUs

Crosby Civil concurs with the recommended scope.

Property Condition Survey MonitorReplace at failure; budget phased program.2032SharedDeferred 2 3$290,000
Westline Commons

Site Amenities — Outparcel green

Portfolio Condition Survey Planned CapitalDesign and construct outdoor dining terrace.2030LandlordOpen 1 1$340,000